1

Add On/Off toggle switch and status for each schedule of a device group from the schedule list

Rather than having to drill down to each individual schedule to see if it is active, provide the toggle switch at the schedule view level to save multiple steps.  

Reply

null

Content aside

  • 1 Votes
  • 2 yrs agoLast active
  • 4Views
  • 1 Following